- 【ZTE】ZTE Nanjing Phase 3
- 【ZTE】ZTE Nanjing Phase 1
- 【Shui On】Shanghai Block 127
- 【Shui On】Wuhan Tiandi A4
- 【Shui On】1 Corporate Avenue Shanghai
- 【SHK】Central Plaza Shanghai
- 【The Wharf Holdings】Wheelock Square Shanghai
- 【Huahong Grace Semiconductors】HHGrace Fab1
- 【HHGrace Semiconductor】HHGrace Fab3
- Golden Eagle Nanjing
- ?Le Royal Meridien Shanghai
- Lenovo Tower Beijing
- Lenovo Corporate R&D Center Beijing
- Shanghai Dawning Center
- Shenzhen Skyworth Digital
- Zhijun Phama Shenzhen
- Dencare Chongqing
- Nantong Cellulose Fibers
- Beijing Legendale Hotel
- Colgate Yangzhou
- Albany Hangzhou
- 【BYD】BYD Huiyang Base
- FAW Wuxi Diesel Engine Works
【BYD】BYD HUIYANG BASE
Project Overview
Founded in 1995, BYD Company Limited is a Hong Kong-listed high-tech private enterprise. Up to date BYD has built 9 production bases of a total area of 7,000,000m2 in cities around China, i.e. Guangdong, Beijing, Shanxi, and Shanghai, etc. The project is for plants C8 and C9 in BYD Huiyang Base.
Effect of Energy Efficiency
According to various production capacities and corresponding air-conditioning loads of BYD, UPPC® control system helps the chiller plants save more energy with the increase of production need. In the case of 70% production capacity, C8 plant will have annual energy saving of 678,560kwh, equivalent to RMB 461,421 and 272 ton of coal. And C9 plant can save energy of 1,861,844 kWh, RMB 1,266,054 and 752 ton of coal each year when the production capacity is 80~90%.