- 【ZTE】ZTE Nanjing Phase 3
- 【ZTE】ZTE Nanjing Phase 1
- 【Shui On】Shanghai Block 127
- 【Shui On】Wuhan Tiandi A4
- 【Shui On】1 Corporate Avenue Shanghai
- 【SHK】Central Plaza Shanghai
- 【The Wharf Holdings】Wheelock Square Shanghai
- 【Huahong Grace Semiconductors】HHGrace Fab1
- 【HHGrace Semiconductor】HHGrace Fab3
- Golden Eagle Nanjing
- ?Le Royal Meridien Shanghai
- Lenovo Tower Beijing
- Lenovo Corporate R&D Center Beijing
- Shanghai Dawning Center
- Shenzhen Skyworth Digital
- Zhijun Phama Shenzhen
- Dencare Chongqing
- Nantong Cellulose Fibers
- Beijing Legendale Hotel
- Colgate Yangzhou
- Albany Hangzhou
- 【BYD】BYD Huiyang Base
- FAW Wuxi Diesel Engine Works
SHANGHAI DAWNING CENTER
Project Overview
Shanghai Dawning Centre, managed by Hongkong Jones Lang LaSalle, is a modern office building in the emerging business district of Putuo. A range of workspace options are offered in the 17-storey building, 75,000 m2, from fully managed suites to individual offices or the use of a large business centre for workers on the move.
Effect of Energy Efficiency
Installed with UPPC® energy-saving system, the chilled water pump can be run at variable speed according to real-time cooling load. The HVAC system energy consumption of Dawning Center will be reduced by 27.5%, up to 361,263kWh per year.