Suqian Insurance Town-Energy Station
The energy station has a total investment of 45.805 million yuan, technically adopts a mature and reliable form of high-efficiency cold and heat sources, combined with Jiangsu Peak Valley electricity price policy, the overall operating cost is low, the overall static recovery period is about 4.27 years, and the overall internal income The rate is about 25.4%, and investment and operation have good feasibility.
-
There are many different ways for the chiller plant to satisfy the system cooling load. For example, the lower temperature chilled water at low flowrate can be supplied to the load side, which causes more energy consumption by the chiller in contrast with less energy consumed ....
-